Skip to Content, Navigation, or Footer.
Saturday, March 28
The Indiana Daily Student

PRESS RELEASE: Bloomington Rail Trail Temporarily Closed at Rogers Street for Road Crossing Improvements

city of bloomington (!)

The following is a press release written by Desiree DeMolina for the City of Bloomington.

The City of Bloomington Parks and Recreation Department is temporarily closing the Bloomington Rail Trail at the Rogers Street crossing for construction of accessibility and safety features.

The trail is closed 1.23 miles south of the trailhead on Country Club Drive, and .81 mile north of the trailhead at Church Lane.

The Rail Trail is closed beginning Oct. 20 and is scheduled to remain closed for up to 30 days. No trail detour is available around the closure area; however, the Rail Trail spur to the Southern Meadows neighborhood remains open. The Monroe County Highway Department has also approved a closure and detour of South Rogers Street at the trail crossing for up to 30 days.

Scope of work at the Rail Trail road crossing includes:

  • Placement of a pedestrian-activated Rectangular Rapid Flashing Beacon (RRFB)
  • A new streetlight for increased visibility
  • 12-foot-wide paved trail sections on both sides of the road
  • Realigning the trail to create a 90-degree crossing at Rogers Street

The project also involves vegetation removal, site grading, stormwater inlet installation, and final site restoration to ensure long-term functionality and integration with the surrounding landscape existing along the Bloomington Rail Trail.

For more information on the Rogers Street closure, visit the Monroe County Highway Department’s list of road closings at https://bton.in/Ge27f.

###

Get stories like this in your inbox
Subscribe