Skip to Content, Navigation, or Footer.
Monday, May 13
The Indiana Daily Student

bloomington

Weekly road closings for Bloomington

ciinterstate2.JPG

There’s a lot of construction around Bloomington and, to help residents and visitors traveling through the area, the Indiana Daily Student will be updating the road closings each week throughout the summer.

Hunters Creek Road, between Hunters Creek Lane and Tower Ridge Road: Hunters Creek Road will be closed until the end of September. Drivers can take State Road 446 and Tower Ridge Road. There will might be possible lane closures Monday and Tuesday.

Rhorer Road, between Walnut Street Pike and the entrance of Kroger: This area will be closed until Spetember. Drivers can still access Kroger via the route.

Cave Road, 200 feet south of Cavewood Court: Closed Starting Tuesday June 25 for pipe installation.

Wampler Road, between Bowman Road and Liberty Hollow Road: Closed from Tuesday June 25 until Thursday June 28 as part of a culvert replacement project.

Some areas remain closed for I-69 construction:

-Industrial Park Drive from Vernal Pike to the end of the street, lane closures possible.

-Second Street Bridge, Bloomfield Road/State Road 45/Second Street at the State Road 37 overpass until the end of June 2018.

-Third Street Bridge from State Road 48/Third Street at the State Road 37 through August 2018.

-Fullerton Pike Interchange with I-69. Workers will be replacing surface pavement on the mainline and on/off ramps.

For more information on construction and activity along the I-69 project, residents and visitors may check the following resources: 

Facebook: I-69 Section 5 – INDOT

Twitter: @I69section5

Website: www.i69indyevn.org. 

Get stories like this in your inbox
Subscribe