Skip to Content, Navigation, or Footer.
Friday, April 19
The Indiana Daily Student

A crosswalk construction sign is pictured April 8 at Kirkwood and Indiana avenues. The entire length of Kirkwood Avenue will be repaved as part of several current construction projects. Carl Cote

caconstructionupdate052720.jpg

A crosswalk construction sign is pictured April 8 at Kirkwood and Indiana avenues. The entire length of Kirkwood Avenue will be repaved as part of several current construction projects.